List of projects completed or under development:
New project |
Modernization / Refurbishment |
Services |
Year |
Project |
Country |
Power |
Description |
---|---|---|---|---|
2019 | Centrale de Sanga - Stage 2 | Democratic Republic of Congo (DRC) | 3x3750KVA | Modernization Complete refurbishment of electrical equipment including control system for 3 units, 70KV switchyard, 6.6KV cubicles, static excitation 250A, HPU & speed governors and SCADA system. Commissioning of the entire electrical system |
Centrale de Bendera | Democratic Republic of Congo (DRC) | 2x10000KVA | Modernization Complete refurbishment of electrical equipment including control system for 2 units, 132KV switchyard, 10KV cubicles, static excitation 400A, HPU & speed governors and SCADA system. Commissioning of the entire electrical system. |
|
Centrale des Moulins | France | 2x8000KVA | Modernization Complete refurbishment of electrical equipment including control system for 2 units, 70KV switchyard, 6.6KV cubicles, static excitation 500A and SCADA system. Commissioning of the entire electrical system |
|
Centrale de Chinfert | France | 800KW | New Project Complete MV and LV electrical system: Engineering, procurement, programming and commissioning |
|
Centrale de Tour en Savoie | France | 600KVA | New Project Complete MV and LV electrical system: Engineering, procurement, programming and commissioning |
|
2018 | Zoti | Georgia | 1x25245KVA + 2x14555KVA |
New project Basic and detail engineering and design of the electrical system |
Centrale du Saillant | France | 1x5600KVA | Modernization Excitation system replacement |
|
Centrale de Châtellerault | France | 4x700KVA | Modernization Excitation system replacement |
|
Centrale du palais des sports de Megève | France |
1x300KVA |
Modernization |
|
Centrale du Moulin d’Olt | France |
2x1300KVA |
Modernization |
|
Central hidroeléctrica Platanar | Costa Rica |
2x7920KVA |
Modernization |
|
2017 | Centrale de St Pierre de Faucigny | France |
1x7500KVA |
Modernization |
Centrale de Sahanivotry | Madagascar |
3x6875KVA |
Modernization |
|
Centrale de Sapiac | France |
2x500KVA |
Modernization |
|
Centrale de Bonneval | France |
935KW + 400KW |
Rehabilitation |
|
Central hidroeléctrica CEDRAL |
Costa Rica |
1400KVA + 1500KVA |
Modernization |
|
2016 | Centrale de Sanga | Democratic Republic of Congo (DRC) |
3x3750KVA |
Modernization Complete refurbishment of low voltage electrical equipment including control system, static excitation 300A, speed governors and SCADA system. |
Centrale de N’Seke | Democratic Republic of Congo (DRC) |
2x875KVA |
New Project Speed governors |
|
Centrale de Rabodanges | France |
1x8500KVA |
Modernization New static excitation panel |
|
2015 | Central hidroeléctrica Chocosuela | Costa Rica |
2x7200KVA |
Modernization Speed governors replacement |
Central hidroeléctrica Doña Julia | Costa Rica |
2x9121KVA |
Modernization Speed governors replacement |
|
Centrale du Bazacle | France |
4x700KVA 3x300KVA |
Modernization New static excitation panels |
|
2014 |
Kalen HEPP AKSU HEPP |
Turkey |
4x8500KVA 1x5000KVA |
Modernization New SCADA system for two power plants in cascade |
Carmen II | Costa Rica | 1x2300VKA |
New project New complete MV and LV electrical system: Engineering, procurement, programming and commissioning |
|
Centrale du Ragot |
France Ariège |
1x650KW |
Modernization New complete MV and LV electrical system: Engineering, procurement, programming and commissioning |
|
Canário Foz da Ribeira |
Portugal (Azores islands) |
1x600KVA 1x600KVA |
Modernization Power and level regulation system replacement |
|
2013 |
Central hidroeléctrica San Lorenzo |
Costa Rica | 2x8650KVA |
Modernization Excitation system replacement |
Central hidroeléctrica Doña Julia |
Costa Rica | 2x9121KVA |
Modernization New control system: Engineering of the complete electrical system, PLCs and SCADA system programming, commissioning
|
|
|
Central hidroeléctrica Platanar | Costa Rica | 2x7920KVA |
Modernization PLCs replacement New SCADA Intake automation (PLC and instrumentation)
|
|
Centrale du pont des moines | France | 3x1700KVA |
New project Engineering of the complete electrical system, PLCs and SCADA system programming, commissioning
|
|
Saray HEPP | Turkey | 2x5500KVA |
New project Engineering of the complete electrical system, PLCs and SCADA system programming, commissioning
|
2012 |
Central hidroeléctrica
Don Pedro y El volcan
|
Costa Rica | 2x16500 KVA | Modernization Excitation system replacement |
Centrale de Sainte Rose |
France
La Reunion island
|
1x1000KVA |
New project Power, control, protection & distribution boards, and commissioning
|
|
|
Hoçgoren HEPP | Turkey |
1x11100KVA 1x4200KVA |
New project Engineering of the complete electrical system, PLCs and SCADA system programming, commissioning
|
|
Sirimtas HEPP |
Turkey |
2x15100KVA |
New project Engineering of the complete electrical system, PLCs and SCADA system programming, commissioning
|
|
Central Hidroeléctrica ZINGUIZAPA |
Honduras |
1x3200KVA |
New project Control, protection & distribution boards, SCADA system and commissioning
|
|
Gemciler HEPP |
Turkey |
3x3300KVA |
New project Engineering of the complete electrical system, PLCs and SCADA system programming, commissioning
|
|
Central hidroeléctrica Los Negros |
Costa Rica |
2x10500KVA |
Modernization Excitation system replacement
|
2011 |
Central hidroeléctrica Aguas Zarcas |
Costa Rica |
2x7660KVA 1x1300KVA |
Modernization PLCs replacement in two power house New SCADA Intake automation (PLC and instrumentation)
|
|
Centrale du Pont du Baup |
France Ariège |
1x220KW |
Modernization Control and power boards replacement. Remote control system by internet.
|
|
Centrale du Moulin de Saint Girons |
France Ariège |
2x40KW |
Modernization Control and power boards replacement. Remote control system by internet.
|